Argall is excited to collaborate with Common ADR on this transformative project. Featuring a hybrid steel and timber structure, the design exposes its intricate framework, contributing the architectural language.
The building geometry required to bracing load transfer through a folding ply lined roof structure, with complex detailing at apexes and troughs.
With preliminary works starting in late 2024, foundation works in early 2025, and completion by mid-2026, this hub will be a cultural and tourism landmark for Swan Hill.
LinkedIn Post: https://www.linkedin.com/feed/update/urn:li:activity:7296272003009822720
#Argall #SwanHill #TourismAndCulturalHub #InnovationInConstruction